STEPS FOR THE IMPLEMENTATION OF HP-RGS BLADE ENCLOSURES
Task 1 :- Create RIB/ILO net (use existing if available) à If New Subnet is needed , Create the SVI on Core switch , Use DHCP and DNS for that location. Make it routable if not .
Task 2 :- Assign IP to RIB/ net à The OA1/ OA2 IP address .
Reserve the ports in RIB switch with Configuration Make the physical connection of OA1/OA2 . IN QIP again Object name should be configured configured for host
Task 3 :- Ask FSO to connect the OA 1 and OA2 cable on reserve ports on the RIB switch .
Task 4:- Create Production net (use existing if available) à If New Subnet is needed , Create the SVI on Core switch , Use DHCP and DNS for that location , Use WDS server for that location based on Windows and linux client Make it routable if not.
Task 5:- Set IP addresses and enable DHCP scope for clients(including PXE option)
Task 6:- Configuration of the FEX with 5k , Use the existing model . Reserve the ports in 5k and ask the FSO to connect the FEX on that ports .
Task 7:- Configure server switch ports for the enclosures.
About the author